The design of this wastewater treatment facility was part of a design-build pursuit comprised of an international team of engineers and other infrastructure specialists. The architectural strategy embraced the industrial nature of the facility. It consisted of a series of 184 concrete columns forming a palisade around the process and operation buildings. The buildings housing operational and administrative functions engage the columns, creating a visually calm and collected interface between the industrial facility and the sensitive harbour waterfront. (Unbuilt.)